Pictures of the Chicken Coop Construction - Finishing touches.
Nesting box
The Roosting bars are in
place.
Bottle and hanger for the chicken watering nipple.
Getting the coop hurricane proof
The coop name is hung with love, ready for the campers to move in.
Food and water is waiting for the campers.
The ramp is in place
Sunflowers to brighten the coop.
The finished coop
Wednesday, March 26, 2014
Pictures of the Chicken Coop Construction - Day EIght
The run door installed.
Casper (Charlie's Cockatiel)Checking out the coop.
Painting complete.
Coop sliding door open and shut
Coop door
Coop Door installed.
Completed coop without the nesting box
Nesting box installed
Monday, March 24, 2014
Pictures of the Chicken Coop Construction - Day Seven
The shingles went on. The shingles were used shingle that we were able to salvage.
The painting began
Painting continues.
View of the back of coop painted.
Front view
A good day of painting
Ready to paint the inside.
Diamond didn't want to be left out.
Saturday, March 22, 2014
Pictures of the Chicken Coop Construction - Day Six
Picking up the sheathing for the roof
Putting on the tar paper.
Roof on.
Tar paper complete.
View of the eves with the roof on.
End of the day.
Thursday, March 20, 2014
Pictures of the Chicken Coop Construction - Day Five
Walls going up on the coop. The multiple colors of wood is because I used salvaged wood.
Once painted you will never know.
Back view of the coop and run.
Frame for the door between coop and run.
End of the day with the coop siding all up.
Wednesday, March 19, 2014
Pictures of the Chicken Coop Construction - Day Four
Work on the coop area.
View showing all the mesh installed.
Coop window and frame for the nesting box.
Tuesday, March 18, 2014
Pictures of the Chicken Coop Construction - Day Three
Mesh is installed below the coop.
Back side of the coop run.
Front view with the mesh installed.
End of day three
Monday, March 17, 2014
Pictures of the Chicken Coop Construction - Day Two
Placing additional supports to hold the wire mesh.
Checking out the strength of the roof or supervising?
Mesh is complete on the
free standing walls.
The Air vents drilled and covered with mesh.
The foundation of the coop is framed.
End of day two.